Egate-100 Ver. 4.0 Indicators 3-1
Chapter 3
Operation
This chapter:
• Explains power-on and power-off procedures
• Provides a detailed description of the front panel controls and indicators and
their functions
• Provides instructions for using a terminal connected to the Egate-100 control
port
• Describes how to navigate menus
• Illustrates the management menu tree.
3.1 Turning On the Unit
³ To turn on the unit:
• AC power: Connect the unit to AC mains using a RAD-supplied power cable.
• DC power: Use the circuit breaker in the building installation to turn the
Egate-100 unit on, connecting the terminals on the DC plug to the DC mains.
The PWR indicator lights up and remains lit as long as Egate-100 receives
power.
Egate-100 requires no operator attention once installed, with the exception of
occasional monitoring of the front panel indicators. Intervention is only required
when the unit must be configured to its operational requirements, or when
diagnostic tests are performed.
3.2 Indicators
The unit's LEDs are located on the front panel as illustrated in
Figure
3-1
.
Table
3-1
lists the functions of the LED indicators.
CONTROL
Egate-100
RDY
ALM
12
LINK
MNG-ETH
LINK
ACT
GbE
ACT
1 2
STM-1/OC-3STM-1/OC-3
LINK
SYNCSYNC
DCE
Figure
3-1. Egate-100 Front Panel (Dual Power Supply Version)